R1-2600114 discussion

Discussion on bandwidth operation for 6GR

From Spreadtrum
Status: not treated
WI: FS_6G_Radio
Agenda: 10.5.1.3
Release: Rel-20
Source: 3gpp.org ↗

Summary

This document contains 4 proposals and 2 observations regarding 6GR BWP operation during and after initial access. It addresses discrete spectrum utilization, CORESET-0 configuration, center frequency misalignment for DL/UL BWPs, and dedicated initial BWPs for LPWA and SCMC scenarios.

Position

Spreadtrum proposes directly adopting the NR mechanism for determining CORESET-0 information via MIB for 6GR initial access. They propose studying discontinuous frequency resources for initial DL/UL BWP to address the limitation that NR's continuous frequency requirement for BWP/CC restricts effective utilization of operators' discrete spectrum resources. They propose studying the feasibility of center frequency misalignment for DL/UL initial BWP, arguing that NR TDD's alignment requirement may limit 6GR application scenarios, particularly considering SCMC sub-band differences. They further propose that the NR concept of downlink/uplink initial BWP serves as a starting point for 6GR, with additional FFS items on dedicated initial BWP for LPWA and multiple initial BWPs for SCMC.

Key proposals

Your notes

Private to your account