RAN1 / #124bis / FS_6G_Radio / Verify

Ericsson · 10.6.1.2

WUS operation in RRC states · RAN1#124bis · Source verification
the AI's delta new vs RAN1#124
Ericsson is a new contributor to this topic at RAN1_124bis. They introduce a requirement to avoid overlapping functionalities like PEI and Rel-19 WUS, proposing a single DL WUS tool per RRC state—a structural constraint absent from prior meeting discussions. They present a novel technical case for full measurement offloading (serving cell RRM, RLM/BFD, and neighboring cell RRM) to the EE processing state, quantified with 60%-90% energy saving gain. They provide the first meeting contribution with specific RSRP accuracy evaluation data tied to RX count and CFO assumptions (2dB accuracy with 2Rx/3 SSBs/160ms periodicity; failure with 1Rx at 5ppm CFO). Their argument that entry/exit conditions for WUS monitoring are unnecessary in Idle/Inactive because 6G WUS targets full cell coverage is a new technical position with no prior counterpart.
AI-synthesized from contributions · all text is paraphrased
Every position summary on this site is generated by an AI from the actual Tdoc contributions. This page shows you the exact source documents the AI read to produce the summary above, so you can verify it yourself. Click any Tdoc ID to view its detail page, or click "3gpp.org ↗" to read the original on the official 3GPP server.

Contributions at RAN1#124bis · 1 doc

R1-2601903 discussion not treated 3gpp.org ↗
WUS operation in RRC states
Position extracted by AI
Ericsson proposes studying a single 6G DL WUS tool for paging indication in Idle/Inactive state and a single WUS feature for PDCCH monitoring indication in Connected state, explicitly requiring the avoidance of overlapping functionalities like PEI and Rel-19 WUS. They argue entry/exit conditions for WUS monitoring are unnecessary in Idle/Inactive states because 6G WUS targets full cell coverage. They present a technical case for offloading serving cell RRM and RLM/BFD measurements, as well as neighboring cell RRM measurements, to EE processing state in RRC connected state, supported by energy saving evaluations showing full offloading provides 60%-90% gain. Their preliminary results indicate EE processing RSRP accuracy of 2dB using 3 SSBs with 160ms periodicity is achievable with 2Rx but may not be achieved with 1Rx under 5ppm CFO, requiring smaller CFO values for the 1Rx case.
Summary
Ericsson presents 7 proposals and 7 observations on 6G WUS operation across RRC states, focusing on UE energy saving via a single WUS tool per state, full cell coverage for idle mode, and offloading RRM/RLM/BFD measurements to energy-efficient (EE) processing. They support studying EE processing measurement accuracy with preliminary results showing RSRP accuracy targets are achievable with 2Rx or smaller CFO values.

Prior contributions

Ericsson has no prior contributions to 10.6.1.2 in the meetings currently tracked. This is either a new contributor to this sub-topic or the earliest meeting in our history.
How this was derived
The AI extracted the "position extracted" field above directly from each Tdoc during summarization. For the delta summary at the top, the AI compared Ericsson's consolidated stance at RAN1#124bis against their stance at RAN1#124 and classified the change as new. Always verify critical claims against the original Tdocs linked above.